Portfolio Overview

Metro Property Solutions โ€ข 8 Buildings โ€ข Last updated: Today at 9:45 AM

Total Portfolio Value
๐Ÿข
$47.2M
+2.3% from last quarter
Reserve Fund Health
โš ๏ธ
64%
3 buildings need attention
Critical Alerts
๐Ÿšจ
5
2 urgent, 3 upcoming
Potential Savings
๐Ÿ’ฐ
$1.8M
Through proactive planning

Building Portfolio

Building Reserve Health Next Major Expense Alert Level Projected Cost Action Required
Maple Estates
123 Maple St, Toronto, ON
78%
Roof Replacement (2027) Low $235,000 Schedule assessment
Park Towers
456 Park Ave, Toronto, ON
52%
HVAC System (2025) High $180,000 Immediate planning
Lakeside Manor
789 Lake Dr, Mississauga, ON
31%
Elevator Modernization (2025) High $320,000 Crisis prevention plan
Sunset Place
321 Sunset Blvd, Toronto, ON
89%
Balcony Repairs (2028) Low $95,000 Continue monitoring
River View Condos
654 River St, Toronto, ON
58%
Windows & Caulking (2026) Medium $475,000 Board presentation needed

Reserve Fund Trends

๐Ÿ“ˆ Interactive Chart: 5-Year Reserve Fund Projections
Shows current trajectory vs. optimal funding levels

Risk Distribution

๐Ÿฅง Portfolio Risk Breakdown
Visual risk assessment across all properties
๐Ÿค–

AI-Powered Insights

๐Ÿšจ Immediate Action Required
Lakeside Manor's reserve fund will be insufficient for planned elevator modernization. Recommend monthly increase of $89/unit starting next month to avoid $4,200/unit special assessment. โ† Click to see AI analysis

๐Ÿ“‹ Source Document Analysis

Reserve Fund Study 2024 - Page 23
"Component: Elevator System (2 cars)
Remaining Useful Life: 12 months
Replacement Cost: $320,000
Current Reserve Allocation: $98,000
Funding Status: CRITICAL SHORTFALL"

๐Ÿค– AI-Generated Analysis

Our AI has identified a critical funding gap. With only $98,000 in reserves against a $320,000 elevator replacement cost due in 12 months, the building faces a $222,000 shortfall. The recommended monthly increase of $89/unit would generate $166,644 annually (156 units ร— $89 ร— 12), which combined with current reserves would cover the expense while maintaining a healthy reserve buffer.

๐Ÿ’ฐ Cost Optimization Opportunity
Bundling Park Towers HVAC and River View window projects could save $47,000 through contractor economies of scale. Optimal timing: Q2 2025.
๐Ÿ“Š Portfolio Performance
Your portfolio's reserve health (64%) is above industry average (52%). Sunset Place and Maple Estates are excellent examples of proactive reserve management.